Showing posts with label perspex. Show all posts
Showing posts with label perspex. Show all posts

Sunday, 20 November 2011




water color test

the metal frame and perspex pipes are finally attached to the motor and after almost 2 weeks waiting time, the corks got delivered as well.time to put it all together.





Friday, 18 November 2011




working with water pt.2

perspex, water, food coloring.








Saturday, 5 November 2011



  


perspex pipes and heat gun

first steps towards a new sculpture